October 1, 2026
November 9, 2022
The previous MUGA pitch at Horniman Primary School was susceptible to flooding and was often left unusable after periods of rainfall. McBains co-ordinated the excavation of the MUGA surface to expose the blocked gulleys, including removal of the concrete ring beam, before a new subbase and 40mm wet-pour surface was installed across the MUGA pitch and a 60mm surface within the playground area. New basketball hoops and removable football goals mean that the space remains multi-functional.
A bird’s eye view of the new facilities is provided by aerial photos taken with a new McBains drone, which is also being utilised by our surveying divisions for pre-acquisition surveys, schedules of conditions and general building surveys. The drone assists the team in accessing hard to reach areas; helping build up an accurate picture of a construction site.
McBains provided building surveying services to the scheme as part of our appointment to provide a surveyor-led, multi-disciplinary team to design and project manage the London Borough of Lewisham’s School Minor Works Programme (SMWP), running from 2022-2025.