Skip to the page's content

Houghton Regis, Bedfordshire

Linmere Heights

Bellway Homes

McBains has secured planning approval, on behalf of Bellway Homes, for Linmere Heights, a new modern neighbourhood in Houghton Regis, Central Bedfordshire.

Linmere Heights comprises two land parcels within Phase 4 of the wider Linmere development – an urban extension which will ultimately provide up to 5,150 homes, schools, a neighbourhood centre, health facilities and extensive green infrastructure.

Our newly-approved design for Linmere Heights will deliver 236 new homes, including a mix of apartments and houses, with 10% of the homes designated as affordable units (both shared ownership and rental).

McBains worked closely with Bellway Homes, Central Bedfordshire Council, LIH and Stantec (the masterplanner and creator of the site-wide design code) to deliver a masterplan that delivers a high-quality and community-focused development.

Key Information

236

homes

10%

affordable

Two

land parcels

Responding sensitively to the site’s opportunities and constraints and guided by the Linmere Area Design Code, the masterplan features:

  • A hierarchy of tree-lined streets and pedestrian/cycle connections, ensuring legibility and connectivity throughout the neighbourhood.
  • Carefully positioned landmark and accent buildings to aid wayfinding and create a strong sense of place.
  • A robust public realm, with homes facing onto green corridors, Hill Park and the Ecology Park, integrating the development with its natural surroundings.
  • A diverse mix of housing types to meet local needs, including market and affordable homes.

The design evolved through a rigorous process of consultation and feedback, ensuring the scheme addresses local character, highways, parking and landscape integration. The layout is based on semi-orthogonal perimeter blocks, with homes facing outward to create secure, attractive streets and public spaces. 

The bulk of dwellings are two storeys, with a variety of eaves lines incorporated to help promote variation in the streetscene and 3 and 4-storey apartment blocks positioned prominently on main frontages. Dwellings vary from detached and semi-detached houses to short terraces of houses and apartments. Groups and landscaping work together to create well defined streets and spaces which highlight the emphasis on a quality public realm.

McBains’ masterplan for Linmere Parcels 2 and 3 demonstrates a commitment to placemaking, design quality and connectivity. The scheme’s legible street hierarchy, distinctive architecture, and integration with existing and future infrastructure will help foster a vibrant, connected community.

Our specialist masterplanning team has previously designed approved masterplans for parcels 1 and 3 of Phase 1 at Linmere and parcels 1 and 2 within Phase 3B for Bellway Homes, along with parcels 4 and 5 of Phase 4 for Tilia Homes.

Latest from McBains

Stay informed with the latest news, insights, and stories from our team.

Discover More

McBains explains

Get the latest insights from McBains and industry news to your inbox.

By submitting your email address, you are agreeing to us storing your data for the purpose of sending you a newsletter.